Used 3 x 5 litre tins of Interfuf 16 blacking for 60 feet of hull
Day #1 = Out of water and pressure wash
Day #2 = Full day of hull preparation - 4 angle grinder wire wheels used
Day #3 = First coat
Day #4 = Second coat
Day #5 = 3rd coat
Day #6 = 4th coat over and around the water line
Day # 7 = Drying time
Day #8 = Back into the water....